Bristol-Myers Squibb Company

Bristol-Myers Squibb Co.
Cafeteria Project

Solution needed for long term cafeteria remodeling project.   Temporary tenting to contain the following elements:
flooring, lighting, carpeting, doors, sidewall and top to be both wind and snow rated.  Tenting will be used for a minimum of nine months.

click on image for larger picture

P5260001w.jpg (29855 bytes) P5260004w.jpg (39472 bytes) P8200002w.jpg (37040 bytes)
site prior to
 installation
front view portable
flooring
P8200005w.jpg (38949 bytes) P8210011w.jpg (40524 bytes) P8210013w.jpg (35421 bytes)
completed floor Losberger
clearspan
  20' x 50' structures
P8280007w.jpg (25886 bytes) P8280008w.jpg (32149 bytes) P8310001w.jpg (18634 bytes)
interior area outside view  inside view
PA010007w.jpg (35488 bytes) PA160002w.jpg (37719 bytes) PA160030w.jpg (29941 bytes)
doors with
access porch
windowed wall
added
 finished product

Home Company Information |  Products Specials Terms | Order/Quote Form | Promotional CD Request  | Contact Us 

Steve Kohn, President
Copyright © 2001 Miller Rentals & Sales. All rights reserved.
Revised: May 29, 2008